Test shoot- Wednesday 4th 4pm-6:30pm (Location 1, corridor scene)
Saturday 7th 10am-3pm (Location 2 shoot, routine scene)
Saturday 7th 10am-3pm (Location 2 shoot, routine scene)
Actors rehearsal- Thursday 12th 4pm-5pm (Location 1, corridor scene)
Main shoot- Saturday 21st 9am-1pm (Location 2 shoot, routine scene)
Thursday 26th 4pm-6:30pm (Location 1, corridor scene)
Thursday 26th 4pm-6:30pm (Location 1, corridor scene)
Edit schedule:
We didn't have a formal schedule for editing apart from our usual group meetings which we used. Aside from those meetings (refer to post "Development:how we intend to work as a group") we also came in individually during our free periods and sometimes if we could lunchtimes, since we all knew what we wanted the rough cut to look like through the animatic we had previously made together. Through this method it was faster in producing our rough cut and also demonstrates a benefit of the animatic.
No comments:
Post a Comment