Note to moderator

Note to moderator:
My name is Godgift Emesi (9044) and for my A2 Coursework I am in group 3 with Monica Aghadiuno (9365), Angela Chen (9025) and Thakshana Yogeswaran (9179).
To see my work, please click on the 3 labels on the right named A2 Research and Planning, A2 Construction and A2 Evaluation, and ignore the rest as that is my classwork.

Group 3 - Music Video

Group 3 - Digipak

Group 3 - Digipak
Our Digipack, top left - back, top right - front, bottom left - inside panel, bottom right - inside panel (CD)
This is a link to our website, click the image above to enter our site

Thursday 12 February 2015

R+P Post 14: Production Schedule (shoot and edit)

Shoot schedule:
Test shoot- Wednesday 4th 4pm-6:30pm (Location 1, corridor scene)
                 Saturday 7th 10am-3pm (Location 2 shoot, routine scene)

Actors rehearsal- Thursday 12th 4pm-5pm (Location 1, corridor scene)

Main shoot- Saturday 21st 9am-1pm (Location 2 shoot, routine scene)
                  Thursday 26th 4pm-6:30pm (Location 1, corridor scene)
Shoot organisation form (schedule)

Edit schedule:
We didn't have a formal schedule for editing apart from our usual group meetings which we used. Aside from those meetings (refer to post "Development:how we intend to work as a group") we also came in individually during our free periods and sometimes if we could lunchtimes, since we all knew what we wanted the rough cut to look like through the animatic we had previously made together. Through this method it was faster in producing our rough cut and also demonstrates a benefit of the animatic. 

No comments:

Post a Comment