Note to moderator

Note to moderator:
My name is Godgift Emesi (9044) and for my A2 Coursework I am in group 3 with Monica Aghadiuno (9365), Angela Chen (9025) and Thakshana Yogeswaran (9179).
To see my work, please click on the 3 labels on the right named A2 Research and Planning, A2 Construction and A2 Evaluation, and ignore the rest as that is my classwork.

Group 3 - Music Video

Group 3 - Digipak

Group 3 - Digipak
Our Digipack, top left - back, top right - front, bottom left - inside panel, bottom right - inside panel (CD)
This is a link to our website, click the image above to enter our site

Friday 27 November 2015

Construction Post 1: Week 1 Production

This week was used as preparation for our real shoot which we agreed to do during the 3rd week of construction. Our priority for this week was:


1) Start and finish making our backdrops (the graffiti set and the panel backdrop)

Preparing our panel background
Preparing our graffiti backdrop


2) Organize booking times for our photo-shoot

The times we booked to shoot were:

Tuesday 7am-12pm
Wednesday 9am-11am
Thursday 4pm-8pm 


3) Finalize our storyboard 
Our finalized storyboard


Our storyboard in the making- me in the editing process of it

4) Email our school janitor to set up our industrial backdrop/set for us

The Scaffolding and ladder we asked
Mr.Armani (the school janitor) 

to set up for us with the 
graffiti backdrop we made
The email we sent Mr.Armani
5) Design our logo

Initially we wanted an urban feel which symbolized our band attitude

1st draft



2nd Draft
We ended up wanting a more sophisticated look which would incorporate 3 iconic colours we could use as synergy for our website

The final design of our logo


6) Start outlaying our website

We used the same synergistic colours of red, black and white, which we used in our logo

The first draft of our website
using stills from our test shoot

No comments:

Post a Comment